Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

177 unique locations (706 components) - Page 1 of 8

Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
124.49 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
107.63 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2028-29 (T-4), 2027-28 (T-4) ...
67.74 MW
59.53 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System (3)
• A Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 component)

A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.

Active • 2026-27 (T-4)
53.17 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Active • 2026-27 (T-4)
53.16 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
50.45 MW
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire. (1 component)

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2026-27 (T-4)
47.26 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build battery energy storage system (2)
• A new build 99.9MW battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
43.38 MW
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
38.98 MW
Loading map...
Showing 25 locations