Storage (Duration 2h)
177 unique locations (706 components) - Page 1 of 8
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
Eccles Birgham Farm TD12 4LU (9 components)
Netherton Farm, Keith AB55 5PE (12 components)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)
A Battery Energy Storage System. (4)
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)
The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components)
A Battery Energy Storage System
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)
A Battery Energy Storage System. (3)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
Land at Somerford Farm, SN16 9RN (4 components)
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 component)
A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire. (1 component)
2H duration Lithium Ion Battery Storage New Build CMU.
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)
This is a 99.9MW battery storage facility connected at 132kV. (2)
Land to the west of Pound Road, Axminster EX135UP (2 components)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)
Battery Project on Greenfield Site (4)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)
Energy facility comprising of battery energy storage sets and ancillary equipment. (2)