Storage (Duration 2h)

82 unique locations (255 components) - Page 1 of 4

land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
• New Build Battery Storage (2)
• New build battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.67 MW
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
124.49 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
63.81 MW
59.53 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
43.38 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• BESS project to be installed within a future Greener Grid Park. (3)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.15 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.36 MW
Land on the east side of Meaford Road, Barlaston, Stoke-on-Trent, ST15 0UU (3 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)
• The CMU comprises lithium ion batteries and is capable of exporting the declared capacity for a duration of 2 hours.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
23.49 MW
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
23.40 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.99 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.46 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.04 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
• A Lithium Ion Energy Storage System (2)
• A 49.9 Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.70 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.41 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
21.23 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.54 MW
Loading map...