Storage (Duration 2h)
82 unique locations (255 components) - Page 1 of 4
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
Netherton Farm, Keith AB55 5PE (12 components)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (4 components)
Battery Storage Plant (2)
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)
A Battery Energy Storage System. (3)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)
This is a 99.9MW battery storage facility connected at 132kV. (2)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
Royle Barn Road, Rochdale, OL11 3DX (5 components)
Battery Energy Storage Site (2)
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components)
Standalone Battery Storage Asset (3)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)
Lithium-based battery energy storage system. (3)
Land on the east side of Meaford Road, Barlaston, Stoke-on-Trent, ST15 0UU (3 components)
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)
Lithium-based battery energy storage system. (3)
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)
This is a 49.99MW battery storage facility connected at 33kV. (3)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)
New Build Battery Storage Facility (3)
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)
This is a 49.9MW battery storage facility connected at 33kV. (2)