Storage (Duration 2h)

23 unique locations (215 components)

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
• A New Build Transmission Connected Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant at Kirkby substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.48 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
• 49.5MW Battery Energy Storage facility (2)
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)

A new build 49.5MW battery energy storage system (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.59 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
Active • 2024-25 (T-4), 2024-25 (T-1) ...
7.40 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
6.67 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System (2)
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
• Battery storage unit (2)
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (4 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
Active • 2025-26 (T-4), 2024-25 (T-4) ...