Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

41 unique locations (296 components) - Page 1 of 2

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
20.22 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)

CMU comprising of battery storage and associated plant (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.94 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
Active • 2027-28 (T-4), 2025-26 (T-4)
10.77 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.28 MW
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares …
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system …
Active • 2027-28 (T-4), 2026-27 (T-4)
6.32 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
• 17.315 MW installed capacity Battery Storage facility (2)
• 17.615 MW installed capacity Battery Storage facility
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.09 MW
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant (2)
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.32 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (8 components)

Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (7 components)

Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.94 MW
3.51 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (2)
• Tesla Battery Energy Storage System
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
2.27 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
• Battery Storage located at Grantham. (2)
• 7 MW of Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Loading map...
Showing 25 locations