Storage (Duration 1h)

299 unique locations (1308 components) - Page 1 of 12

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Battery Storage Station
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Active • 2026-27 (T-4)
53.16 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (3)
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
20.22 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
• A new build 49.5MW battery energy storage system (4)
• A new build 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)

CMU comprising of battery storage and associated plant (7)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.94 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 hour battery storage system.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.17 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• A gas fuelled generating station. (2)
• Battery Energy Storage System (2)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• 49.990 MW battery energy storage system at Richborough Energy Park
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.34 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 34MW battery energy storage system (2)
• A new build 34MW battery energy storage system commissioned in July 2021 (2)
• A new build 32MW battery energy storage system
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
• 50MW/50MWh one hour battery (3)
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
12.58 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Danks Wy, Golds Hill, West Bromwich, Tipton, DY4 7BT (1 component)

99.4MW / 99.4MWh BESS

Active • 2026-27 (T-4)
11.74 MW
Loading map...
Showing 25 locations