Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1.5h)

106 unique locations (342 components) - Page 3 of 5

Blandford Road, Poole, BH16 6AB (4 components)
• A 25MW New Build Battery Storage Site (2)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.53 MW
Land to the east of the Channel, Burstall, Suffolk, IP8 4JL (1 component)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4)
8.89 MW
LAND SOUTH OF TUXFORD ROAD, SKEGBY, NOTTINGHAMSHIRE, NG23 6TH. (1 component)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4)
8.89 MW
LAND SOUTH WEST OF COWLEY SUBSTATION, NUNEHAM COURTENAY, OXFORD, OX44 9PA (1 component)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4)
8.89 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (4)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.87 MW
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (1 component)

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

Active • 2028-29 (T-4)
7.87 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
• New Build 25 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
Active • 2026-27 (T-4), 2025-26 (T-4)
7.46 MW
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
7.32 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.25 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)

New build battery storage facility.

Active • 2026-27 (T-4)
7.11 MW
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2026-27 (T-4)
6.68 MW
6.57 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.08 MW
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2027-28 (T-4)
5.75 MW
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 component)

A 47.500 MW / 71.250 MWh battery energy storage system

Active • 2027-28 (T-4)
5.47 MW
Land at West Road, Trafford Park, M41 7SW (7 components)
• Battery Storage Station (3)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
4.84 MW
Land 260m to the southwest of Alness Grid Sub Station, Mid Balnacraig, Alness, Highlands, Scotland IV17 0YA (1 component)

Standalone Battery Storage on greenfield land near Alness substation

Active • 2027-28 (T-4)
4.78 MW
4.78 MW
Land 75 metres southeast of Camas House Fairways Business Park Inverness, IV2 6AA (1 component)

Battery energy storage facility comprising access track, compound of battery & electrical equipment, meter building, stores, fencing, security cameras, and associated landscaping

Active • 2027-28 (T-4)
4.78 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
4.71 MW
Loading map...
Showing 25 locations