Storage (Duration 1.5h)
106 unique locations (342 components) - Page 3 of 5
Blandford Road, Poole, BH16 6AB (4 components)
Land to the east of the Channel, Burstall, Suffolk, IP8 4JL (1 component)
Lithium-based battery energy storage system.
LAND SOUTH OF TUXFORD ROAD, SKEGBY, NOTTINGHAMSHIRE, NG23 6TH. (1 component)
Lithium-based battery energy storage system.
LAND SOUTH WEST OF COWLEY SUBSTATION, NUNEHAM COURTENAY, OXFORD, OX44 9PA (1 component)
Lithium-based battery energy storage system.
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)
49.9MW Lithium-ion Energy Storage System (4)
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (1 component)
49.9MW lithium ion battery energy storage located at Berkswell near Coventry
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)
New Build 25 MW Battery Energy Storage system (2)
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)
New build battery storage facility.
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 component)
The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …
Land north of Butterfly Lane, land surrounding Hilfield Farm and land west of Hilfield Lane, Aldenham, near WD25 8DD (1 component)
A 57.000 MW / 85.500 MWh battery energy storage system
Land to the south of Church Farm, Somersham, IP8 4PN and land to the east of The Channel, Burstall, IP8 4JL (1 component)
A 57.000 MW / 85.500 MWh battery energy storage system
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 component)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 component)
A 47.500 MW / 71.250 MWh battery energy storage system
Land at West Road, Trafford Park, M41 7SW (7 components)
South Pargillis, Clockluine Road, Hillend, Dunfermline, KY11 7HS (1 component)
Battery storage station
Land 260m to the southwest of Alness Grid Sub Station, Mid Balnacraig, Alness, Highlands, Scotland IV17 0YA (1 component)
Standalone Battery Storage on greenfield land near Alness substation
Richborough Energy Park, Ramsgate Road, Sandwich, CT13 9NL (1 component)
Battery Energy Storage
Land 75 metres southeast of Camas House Fairways Business Park Inverness, IV2 6AA (1 component)
Battery energy storage facility comprising access track, compound of battery & electrical equipment, meter building, stores, fencing, security cameras, and associated landscaping
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom (1 component)
Battery energy storage system