Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1.5h)

38 unique locations (184 components) - Page 1 of 2

Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Battery Storage Station
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)
• 49.5MW Battery Energy Storage facility connected to 132kv network (4)
• 48MW Battery Energy Storage facility connected to 132kv network
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
• 49.5MW Battery Energy Storage facility (3)
• 48MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
• A new build 49.5MW battery energy storage system (4)
• A new build 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
• 49.5MW Battery Energy Storage facility (2)
• 48MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
• 49.5 MW Battery Energy Storage facility (3)
• 48 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
• A new build 49.5MW battery energy storage system (4)
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.59 MW
Rusholme Grange, Drax, YO8 8PW (4 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.96 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (4)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.87 MW
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
Active • 2026-27 (T-4), 2025-26 (T-4)
7.46 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.25 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.08 MW
Land at West Road, Trafford Park, M41 7SW (7 components)
• Battery Storage Station (3)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.27 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
• Battery Storage Station (3)
• 3 x 2MW gas gen sets
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system (2)

Active • 2025-26 (T-4), 2024-25 (T-1)
Loading map...
Showing 25 locations