Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 5h)

3 unique locations (26 components)

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
• A New Build Gas fuelled power plant at Kirkby substation. (2)
• A New Build Transmission Connected Battery Energy Storage System. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.48 MW
Loading map...
Showing 3 locations