Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

7 unique locations (10 components)

Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (2 components)

A new build 20MW battery energy storage system

Inactive • 2023-24 (T-1)
7.40 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Loading map...
Showing 7 locations