Theme

Storage (Duration 2h)

50 unique locations (428 components) - Page 1 of 2

Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.96 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
• A Battery Energy Storage System. (3)
• A New Build Gas fuelled power plant.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.65 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (3)
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield … (2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (3)
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)
• A Battery Energy Storage System (3)
• A Battery Energy Storage System.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.47 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
• A new build 49.5MW battery energy storage system (4)
• A new build 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
• 49.5MW Battery Energy Storage facility (3)
• 48MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
• 49.5 MW Battery Energy Storage facility (3)
• 48 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)
• 49.5MW Battery Energy Storage facility connected to 132kv network (4)
• 48MW Battery Energy Storage facility connected to 132kv network
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
• 49.5MW Battery Energy Storage facility (2)
• 48MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
• A new build 49.5MW battery energy storage system (4)
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.59 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 34MW battery energy storage system (2)
• A new build 34MW battery energy storage system commissioned in July 2021 (2)
• A new build 32MW battery energy storage system
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
• Battery Storage Plant (4)
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.56 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works … (3)
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
Active • 2024-25 (T-4), 2024-25 (T-1) ...
7.40 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (3)
• Energy facility comprising of reciprocating engine sets and ancillary equipment. (2)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (4)
• Tesla Battery Energy Storage System
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
Stonehill, Charlton, Malmesbury, SN16 9RP (1 component)

49.900MW OF BATTERY ENERGY STORAGE SYSTEMS

Active • 2024-25 (T-4)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Gas fuelled power plant at Capenhurst substation (3)
• A New Build Battery Energy Storage System (2)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations