Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

19 unique locations (164 components)

Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
• A new build 49.5MW battery energy storage system (4)
• A new build 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)
• 49.5MW Battery Energy Storage facility connected to 132kv network (4)
• 48MW Battery Energy Storage facility connected to 132kv network
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 34MW battery energy storage system (2)
• A new build 34MW battery energy storage system commissioned in July 2021 (2)
• A new build 32MW battery energy storage system
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
• Battery Storage Plant (4)
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.56 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (4)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.56 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.25 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
• Battery storage plant (4)
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.14 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (4)
• Tesla Battery Energy Storage System
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
Mannington Depot, Telford Way, Swindon, SN5 8BA (2 components)

A Battery Energy Storage System (2)

Active • 2024-25 (T-4), 2022-23 (T-1)
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (4)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (3 components)

A Battery Energy Storage System. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
• Battery storage unit (2)
• New reciprocating gensets in acoustic enclosure (2)
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 19 locations