Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2.5h)

6 unique locations (18 components)

Minchens Lane Bramley Tadley RG26 5BJ (4 components)
• 99.000MW Battery Energy Storage site (3)
• New Build Battery Energy Storage site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
87.10 MW
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
23.40 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
• Battery Storage Station (3)
• 3 x 2MW gas gen sets
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.10 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.10 MW
Loading map...
Showing 6 locations