Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2.5h)

6 unique locations (27 components)

East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 hour battery storage system.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.17 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
• Battery Storage Station (3)
• 3 x 2MW gas gen sets
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Minchens Lane, Bramley, TADLEY RG26 5BJ (1 component)

99MW of Battery Energy Storage Systems

Active • 2025-26 (T-4)
Loading map...
Showing 6 locations