80 unique locations (274 components) - Page 1 of 4

Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Clayhill Farm, Greenfield Rd, Westoning, Bedford, MK45 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Inactive • 2021-22 (T-4)
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
• 10 MW Storage facility located at Balby, Doncaster. (2)
• 10 MW Storage facility
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Inactive • 2023-24 (T-1)
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (3 components)

Battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 … (2)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Burnley Road Simonstone BB12 7ND (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2019-20 (T-1)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Inactive • 2023-24 (T-4)
Roundswell Business Park, Barnstable, Devon EX31 3TD (1 component)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site (2)
• A 29.5MW New Build Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-3)
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components)

20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (7 components)
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services. (2)
• Battery Energy Storage System located at Minety
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations