Storage (Duration 1h)
43 unique locations (151 components) - Page 1 of 2
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)
Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)
Battery Energy Storage System (3)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
Crossways, Greenhithe, DA9 9BB (3 components)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)
Perseverance Road, Hereford, UK, HR4 9SE (1 component)
A 8MW New Build Battery Storage Site
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)
The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)
Lascar Works, Tanpits Road, Bury BL9 5BY (1 component)
20.000 MW of battery storage located at Lascar Works
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)
10MW battery energy storage facility at Upton Lane, Rownhams (3)
Land at Traston Road, Newport NP19 4PW (1 component)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)
Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)
Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)
2MW BESS (3)
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)
Battery Energy Storage System (2)
Land south of Westerton Road, Keith Moray, Scotland AB55 5NR (1 component)
Battery Storage
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)
Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)