Storage (Duration 1h)
43 unique locations (151 components) - Page 1 of 2
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)
Battery Energy Storage System (4)
Land off Carseview Road, Forfar, DD8 3BS (7 components)
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
Crossways, Greenhithe, DA9 9BB (3 components)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)
Perseverance Road, Hereford, UK, HR4 9SE (1 component)
A 8MW New Build Battery Storage Site
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)
The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
Lascar Works, Tanpits Road, Bury BL9 5BY (1 component)
20.000 MW of battery storage located at Lascar Works
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)
10MW battery energy storage facility at Upton Lane, Rownhams (5)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)
Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)
Land at Traston Road, Newport NP19 4PW (1 component)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components)
The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (2)
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)
Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)