34 unique locations (397 components) - Page 1 of 2

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (3)
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
• A new build 49.5MW battery energy storage system (4)
• A new build 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• A gas fuelled generating station. (2)
• Battery Energy Storage System (2)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 34MW battery energy storage system (2)
• A new build 34MW battery energy storage system commissioned in July 2021 (2)
• A new build 32MW battery energy storage system
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
• Battery Storage Plant (4)
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.56 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
• Existing 25 MW storage site using Lithium Ion Batteries (3)
• 25 MW storage site using Lithium Ion Batteries (2)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.29 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
• 17.315 MW installed capacity Battery Storage facility (2)
• 17.615 MW installed capacity Battery Storage facility (2)
• 19.791 MW installed capacity Battery Storage facility
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.09 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.55 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
• battery storage unit (3)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.22 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (4)
• Tesla Battery Energy Storage System
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1.46 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)
• 6.000MW of storage located at Westoning (4)
• 6.000MW of battery storage located at Westoning.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.11 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery storage (2)
• Battery strorage unit (2)
• Battery Storage
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (3)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales. (2)
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (4)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...