Storage (Duration 1h)

10 unique locations (92 components)

Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.55 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
• 5MW, 1 hour/5MWh lithium-ion battery (4)
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
• 1.200MW Battery Energy Storage System (3)
• 1.2 MW of demand reduction
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (3)
• 1.200 MW of demand reduction
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (3)
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction (2)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery storage (2)
• Battery strorage unit (2)
• Battery Storage
Active • 2024-25 (T-4), 2023-24 (T-4) ...