Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1.5h)

41 unique locations (96 components) - Page 1 of 2

via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
• 247.5 MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
• 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
Active • 2027-28 (T-4)
114.05 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Battery Storage Station
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build battery energy storage system (2)
• A new build 99.9MW battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Craigie, South Ayrshire, Scotland, KA1 5JT (2 components)

A 175MW New Build Battery Storage Site Component

Active • 2027-28 (T-4)
40.32 MW
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
• A 110.000 MW / 165.000 MWh battery energy storage system
• A 120.000 MW / 180.000 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
31.60 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
• New Build Battery Energy Storage system (2)
• New Build 49.99 MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.54 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
• New Build Battery Energy Storage system (2)
• New Build 49.5 MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.45 MW
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
• New Build 99.9 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
30.06 MW
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
• 25MW Lithium-ion Energy Storage System
• 99.9MW Lithium-ion Energy Storage System
Active • 2027-28 (T-4)
28.78 MW
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
27.29 MW
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
• New Build Battery Energy Storage system (2)
• New Build 49.9MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.77 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
18.37 MW
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
• A New Build Distribution Connected Battery Energy Storage System.
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2027-28 (T-4), 2026-27 (T-4)
17.52 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
16.74 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
16.07 MW
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
13.65 MW
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (2 components)
• A 46.000 MW / 69.00 MWh battery energy storage system
• A 47.500 MW / 71.250 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
12.79 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
9.71 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
• New Build 25 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
7.32 MW
Loading map...