Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Reciprocating engines

386 unique locations (2319 components) - Page 1 of 16

Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)

Existing OCGT (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (6 components)

Gas reciprocating engines (6)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
141.48 MW
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (15 components)

Gas peaking reciprocating engine (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
141.48 MW
Land north of the railway Line, Bellamour Lane, Wolsey Bridge  WS15 3JS (12 components)

Gas peaking reciprocating engine (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
95.16 MW
Land adjacent to the M4, Howe Lane, Maidenhead, SL6 3JL (8 components)

Gas reciprocating engines (4)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
95.16 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (16 components)
• 10 x 2MW Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear at Stanhope industrial …
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2026-27 (T-4) ...
59.99 MW
Griffiths Road, Lostock Gralam, Northwich, CW9 7XU (8 components)
• 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local … (3)
• 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
56.04 MW
Mannaberg Way, Scunthorpe, East Yorkshire, DN15 8XF (8 components)

20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.76 MW
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (4 components)

Gas reciprocating engines (4)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
47.58 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (24 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected … (3)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (3)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (11 components)
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network. (3)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (12 components)
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas … (3)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.53 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (15 components)
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network. (4)
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network. (3)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution … (2)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.43 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
41.65 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
• A New Build Gas fuelled power plant at Kirkby substation. (2)
• A New Build Transmission Connected Battery Energy Storage System. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.48 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (18 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (5)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (17 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (5)
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.27 MW
Loading map...
Showing 25 locations