365 unique locations (2101 components) - Page 1 of 15

Land north of the railway Line, Bellamour Lane, Wolsey Bridge  WS15 3JS (12 components)

Gas peaking reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
95.16 MW
Land adjacent to the M4, Howe Lane, Maidenhead, SL6 3JL (8 components)

Gas reciprocating engines (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
95.16 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (16 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• A new build, gas fuelled generation plant with ancillary equipment.
• A new build, gas fuelled generation station
Active • 2027-28 (T-4), 2026-27 (T-4) ...
59.99 MW
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (4 components)

Gas reciprocating engines (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
47.58 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
• A New Build Transmission Connected Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant at Kirkby substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.48 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (11 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.87 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (15 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
13.75 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
4 Finway Road Hemel Hempstead HP2 7PT (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.43 MW
Pandora Business Park Greengate Middleton Manchester M24 1RU (10 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
8.19 MW
Land off of Venture Road, Fleetwood, Lancashire, FY7 8RS (12 components)

Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (14 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Land off Axe Road, Colley Lane Industrial Estate, Bridgwater, TA6 5LP (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.85 MW
Land at Exmoor Windows Brunel Way Minehead TA24 5BY (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.85 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (12 components)
• New reciprocating gensets in acoustic enclosure (2)
• Reciprocating genset
Active • 2026-27 (T-4), 2023-24 (T-4) ...
6.43 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (11 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.19 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (7 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.64 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (14 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.35 MW
Loading map...
Showing 25 locations