Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Open Cycle Gas Turbine (OCGT)

12 unique locations (151 components)

Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (26 components)
• Killingholme Module 1 converted to open cycle operation (8)
• Killingholme Module 2 converted to open cycle operation (8)
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three … (3)
• ... and 3 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1775.69 MW
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (17 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility. (3)
• Two gas turbines operating in open cycle mode. Not a Storage Facility (2)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each. (4)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (2 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (3 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Mill Lane, Kirkby in Ashfield, NG17 9LG (1 component)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2019-20 (T-1)
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (4)
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (12 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station. (5)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (9 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station. (5)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 12 locations