Home List View Map View Technologies Companies Support Us Help Login Register
Theme

OCGT and Reciprocating Engines

511 unique locations (2424 components) - Page 3 of 21

Land to the North (adjacent Metro Line) Bilport Lane, Wednesbury, West Midlands WS10 0PD (2 components)

A generating Station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate, to export. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Supergas Industrial Estate, Downs Road, Minster Lovell, Witney, Oxfordshire, OX29 0SZ (1 component)

New build 20MW LNG fired Gas Generation facility, connected at the distribution network boundary using a COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4)
Fort Parkway, Heartlands, Birmingham, B24 9QT (6 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Freightliner Road, Hull, HU3 4UW (2 components)

A New Build 20MW Gas Fuelled Generating Station. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Salford Road, Bolton, Greater Manchester BL5 1DG (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Land to west of Grange Lane Brinsworth Rotherham S60 1FG (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2021-22 (T-4)
LAND OFF HELEN STREET, GLASGOW, G52 1EE (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2021-22 (T-4)
Land South of Main Road, Bilton, Hull, HU11 4DU (1 component)

New build Gas powered generators with export up to 21MW. Refer to the Covering Letter for further details.

Inactive • 2021-22 (T-4)
2 Parsonage Lane, Rochester, Kent, ME2 4UR (1 component)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4)
The Power House Commercial Road Wolverhampton WV1 3QS (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Vicarage Lane, Off Church Lane Newton With Scale, Preston PR4 3RX (1 component)

A gas or diesel fired grid support generating plant.

Inactive • 2021-22 (T-4)
Monkton Road, Wakefield, Yorkshire, WF2 7AL (13 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lostock Hollow, Lostock Gralam, Northwich CW9 7PA, UK (1 component)

16MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.

Inactive • 2021-22 (T-4)
Nottinghamshire Recycling Centre, Shireoaks Road, Worksop S80 3HA (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Fordbridge Ln, Blackwell, Alfreton DE55 5NS (6 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Factory Lane, Croydon, Surrey, CR0 3LE (4 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Wellington Street, Oldham, Greater Manchester, OL4 1SA (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Burrington Business Park Burrington Way Plymouth PL5 3LX (1 component)

New build generating CMU comprising of gas fuel reciprocating generation sets and gas delivery plant.

Inactive • 2021-22 (T-4)
Unit D, Kendale Rd, Scunthorpe DN16 1DT (10 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (5 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations