Home List View Map View Technologies Companies Support Us Help Login Register
Theme

OCGT and Reciprocating Engines

46 unique locations (172 components) - Page 1 of 2

Radstone Rd, Radstone, Brackley NN13 5PY (5 components)
• A new build diesel or gas grid support plant (3)
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.68 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit 2c (N), North Road, Marchwood Industrial Park, Marchwood SO40 4BL (4 components)
• The CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. The CMU is metered … (2)
• This CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. It uses a COP2 … (2)
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S803LH (2 components)

Reciprocating engines (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components)
• two 1.4MW caterpillar generators (2)
• 11MW of 60 minute frequency response, battery storage
Inactive • 2021-22 (T-4), 2018-19 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk (3 components)
• Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at … (2)
• A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Lodge Lane, Haydock WA12 0HH (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (2 components)

Gas engine system capable of exporting electricity. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to the South of Wolverhampton Penn sub-station, Union Lane, Lower Penn, South Staffordshire, WV5 7JD. (2 components)

Energy facility comprising of reciprocating engine sets. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land off Peel Road, Fylde, FY4 5LN (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Nottinghamshire Recycling Centre, Shireoaks Road, Worksop S80 3HA (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Whaley Rd, Barugh Green, Barnsley S75 1HS, UK (2 components)

one 1.2MW caterpillar generator (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Wolverhampton Powerhouse, Commercial Road, Wolverhampton WV1 3QS (2 components)
• A 4MW generating gas grid support plant.
• A 4MW generating grid support plant.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
O?Brien Skip Hire, Old Droppingwell Road, Sheffield, S61 2DJ (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Sands Leisure Complex, Burnison Road, Scarborough, YO12 6PH (2 components)

Two 1.2MW caterpillar generators (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (2 components)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land 15, Carr hill, Balby, Doncaster, DN4 8DG (4 components)
• A new build gas fuelled generating station. (2)
• A 10MW new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (5 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each (3)
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (4 components)
• New build diesel or gas dual fuel generating station (2)
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (5 components)

A new build gas fuelled generating station. (4)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Snape Lane, Doncaster, DN11 8RU (2 components)
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Ernest Nunn Road, Stowmarket IP14 2AH (2 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site. (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands WS10 0NT (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1)
Loading map...
Showing 25 locations