Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (11 components)

Great Yarmouth 1 - CCGT MSID: 7111 (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1122.91 MW
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ (7 components)
• EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (4)
• EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1047.71 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
Clough Lane North Killingholme North Lincolnshire DN40 3JP (7 components)

A combined cycle gas turbine generating plant (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
859.77 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit (7)
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (17 components)
• Existing CCGT (3)
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174 (3)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
136.67 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (10 components)
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF. (3)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
112.19 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Huntsman Drive, Seal Sands, TS2 1TT (3 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

Active • 2024-25 (T-1), 2023-24 (T-1)
31.97 MW
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (4 components)
• Hythe Power Station - Auxiliary load behind boundary meter (2)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (7 components)
• Keadby GT3 (3)
• Keadby 1 CCGT
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land … (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (3 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-19= 100% T_WBURB-2
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit (2)
• Knottingly Unit 2 is a combined cycle gas turbine generating unit (2)
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
ASHLAND FARM BECK LANE SKEGBY SUTTON IN ASHFIELD NG19 6PG (3 components)

NEW BUILD GAS FUELLED GENERATING STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Basin Road South. Portslade. East Sussex. BN41 1WF (4 components)

Combined Cycle Gas Turbine plant (4)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (7 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (5)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• CCGT Unit 2 (connected as G2)
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B. (3)
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B. (2)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (2 components)

Combined Cycle Gas Turbine (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)