77 unique locations (849 components) - Page 1 of 4

Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (29 components)
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is … (6)
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit … (6)
• TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is … (2)
• ... and 7 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
300.51 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components)
• existing on site CHP (3)
• existing onsite CHP (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
46.25 MW
Perenco UK, Wytch Farm, Thrashers Lane, Corfe Castle, Dorset, BH20 5JR (14 components)

Gas Engine (4)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
39.64 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions. (2)
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity …
Active • 2025-26 (T-1), 2024-25 (T-4) ...
38.03 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (4 components)

On-site Generating CMU. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
28.42 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components)
• existing CHP on site. (3)
• existing on site CHP (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
28.35 MW
Drakemyre, Dalry KA24 5JJ (18 components)
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
26.66 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• This is an existing CHP (4)
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.83 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
• existing CHP on site (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.04 MW
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
• a Combined Heat and Power Plant (3)
• A Distribution Connected 4.5MW gas fueled generating station (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.54 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.15 MW
1 Thane Road West, Nottingham, NG2 3AA (60 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (3)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA. (2)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.30 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (36 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
• 6 CHP engines horticultural environment with no auxiliiary load (4)
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
13.39 MW
Station Road, Wigton, Cumbria CA7 9BG (29 components)
• Gas engine (3)
• Gas turbine (2)
Active • 2024-25 (T-4), 2024-25 (T-1) ...
11.17 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.45 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the … (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.19 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
• 2MW gas CHP engine in a horticultural environment (2)
• One 2MW gas CHP engine in a horticultural environment (2)
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.54 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.39 MW
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.35 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)

Gas fuelled CHP generation plant (5)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.19 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (3)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.87 MW
Loading map...
Showing 25 locations