Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Heat and Power (CHP)

79 unique locations (859 components) - Page 1 of 4

Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (14 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383 (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
122.26 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components)
• existing on site CHP (3)
• existing onsite CHP (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
46.25 MW
Perenco UK, Wytch Farm, Thrashers Lane, Corfe Castle, Dorset, BH20 5JR (14 components)

Gas Engine (4)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
39.64 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components)
• existing CHP on site. (3)
• existing on site CHP (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
28.35 MW
Drakemyre, Dalry KA24 5JJ (18 components)
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
26.66 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• This is an existing CHP (4)
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.83 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
• existing CHP on site (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.04 MW
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (8 components)

Gas fired CHP unit (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.51 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.15 MW
1 Thane Road West, Nottingham, NG2 3AA (60 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (3)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA. (2)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.30 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.79 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (8 components)

Gas Turbine Cogeneration Unit GT3 (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.01 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (27 components)
• One of three CHP in a horticultural environment (8)
• One of three CHP in a horticultural environment. (8)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.69 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
• 6 CHP engines horticultural environment with no auxiliiary load (4)
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
13.39 MW
Imperial College London, South Kensington Campus, SW7 2AZ (18 components)
• A 4.5MW gas fired reciprocating engine CHP (Engine 1). (3)
• A 4.5MW gas fired reciprocating engine CHP (Engine 2). (2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.15 MW
Station Road, Wigton, Cumbria CA7 9BG (29 components)
• Gas engine (3)
• Gas turbine (2)
Active • 2024-25 (T-4), 2024-25 (T-1) ...
11.17 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.54 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.39 MW
Pontefract Rd, Leeds, LS10 1AX (16 components)

CHP unit (5)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
8.38 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)

Gas fuelled CHP generation plant (5)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (23 components)

CHP unit (5)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.22 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (7 components)

CHP Engine 3.360MW (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.13 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.85 MW
Loading map...
Showing 25 locations