Combined Heat and Power (CHP)

34 unique locations (490 components) - Page 1 of 2

Cargill PLC, Trafford Park, Manchester, M17 1PA (48 components)
• Siemens SGT200 based CHP (13)
• Solar T70 Based CHP System (13)
• Solar T70 based CHP system (13)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.64 MW
Drakemyre, Dalry KA24 5JJ (18 components)
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
26.66 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (18 components)

Combined Heat and Power Plant Olympic Park London (12)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.77 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (25 components)
• 1.2 MW Combined Heat and Power Engine. (6)
• 1.6 MW Combined Heat and Power Engine (6)
• 1.6MW Combined Heat and Power Engine (4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.41 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (12 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (6)
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (2)
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel … (2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (11 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (5)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (5)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Port Causeway Bromborough Merseyside CH62 4TH (16 components)

Turbomach M50 Natural Gas fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.03 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market … (3)
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas (2)
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
Montgomery Road, Aberdeen AB24 2YA (14 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation … (10)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.46 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific … (6)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas (2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.28 MW
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (6 components)
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2 (3)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (6 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2 (2)
• Steam Turbine (2)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
• 2.8MWe back pressure steam turbine (3)
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200) (2)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (11 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital (5)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (5 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital (4)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (7 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (10 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas (2)
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess. (2)
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (35 components)
• Steam Driven Turbo Alternator 8G1 6,8 MWe (2)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (12 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site. (3)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity. (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (14 components)
• One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA (2)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...