Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Coal

10 unique locations (473 components)

Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (64 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (3)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
472.94 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (54 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5. (8)
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC. (7)
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC. (5)
• ... and 8 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
268.28 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (57 components)
• Aux. load separately metered (2)
• GT5
• GT8
• ... and 1 more unique description
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Drax Power Station, Drax, Selby, YO8 8PH (20 components)
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. (8)
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4. (2)
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC. (2)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (20 components)
• Cottam Power Station CMU 1 CT1-18 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-1 …
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-2 …
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)

Aberthaw 7 Coal fired unit (5)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (86 components)
• GT2
• Generating Unit 1
• Generating Unit 2
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (63 components)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 10 locations