174 unique locations (1848 components) - Page 3 of 7

John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (6 components)
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU. (4)
• New 4.5MW CHP at Oxford Hospital
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.07 MW
Port Causeway Bromborough Merseyside CH62 4TH (16 components)

Turbomach M50 Natural Gas fired CHP unit (5)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.03 MW
International Conference Centre, Birmingham, B1 2EA (15 components)

1.6MW Combined Heat and Power at International Conference Centre (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.03 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (13 components)

One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load. (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.64 MW
9 Handyside St, Kings Cross, London N1C 4BH (11 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (11 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity … (2)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.39 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load. (5)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.97 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Ashgrove Road West, Aberdeen AB16 5UL (14 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Montgomery Road, Aberdeen AB24 2YA (14 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation … (10)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.46 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)

One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load. (5)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
2.06 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (15 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602 (3)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.60 MW
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (4 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity … (2)
• Gas reciprocating engine (2)
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.46 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific … (6)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas (2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.28 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Two gas CHP engines in commercial horticultural environment with no auxilliary load (4)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Queensland Road, Islington, London, N7 7AJ (2 components)

A reciprocating gas engine CHP providing hot water to a local CHP network (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
COFELY Great Coates, Grimsby, DN31 2TT (40 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (3)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (2)
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (3 components)

One 3.7 MWe gas fired CHP (Centrax KB5) (3)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Par Docks, Par, Cornwall PL24 2SQ (11 components)
• One 3.7 MWe gas fired CHP (Centrax KB5) (3)
• Two 3.7 MWe gas fired CHP (2)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Springfields Salwick, Preston, PR4 0XJ (2 components)

2 x CHP (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Brigg Road, Scunthorpe, DN16 1BP (2 components)

CHP units (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Pyewipe, Grimsby DN31 2SR (2 components)

CHP (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (6 components)
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2 (3)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...