wind

13 unique locations (58 components)

West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (3 components)
• The CMU is an onshore windfarm connected to the distribution system at the Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.16 MW
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (2 components)

1 x Wind Turbine Generating Unit (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
0.28 MW
Tealing Substation, Myreton Farm Cottages, Strathmartine, Dundee DD3 0PY. (14 components)
• Offshore Wind Farm with 30 Wind Turbines (2)
• Offshore wind farm with 38 wind turbines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
110.23 MW
Siemens Energy Construction Site Moray West 400kv Substation, Whitehillock Farm, Aberdeenshire, AB55 5PH The CMU Component is an offshore wind farm. An Ordnance Survey Grid reference of the CMU Component is provided below. (3 components)

The CMU component is an offshore wind farm which consists of: ? 40 X SGRE DD 222 X 14.7 MW Wind Turbine Generators (WTG). ? 40 X monopile foundations (MP). … (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
102.40 MW
Pearie Law, West Calder, West Lothian, EH55 8LT (4 components)

1 x Wind Turbine Generator

Active • 2026-27 (T-4)
1.40 MW
Hazelside, Glespin, Lanark, Scotland, ML11 0RL (8 components)

13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.19 MW
Harting Rig Wind Farm, Lambhill Road, Nr Strathaven, South Lanarkshire, ML106XF (3 components)

Wind Turbine Generators x 15 (3)

Active • 2026-27 (T-4), 2024-25 (T-1) ...
4.13 MW
Enoch Hill Wind Farm, Dalleagles, connecting via New Cumnock Substation, Cummnock, KA6 7PT (1 component)

The BMU is a Wind farm consisting of up to 16 wind turbines and associated infrastructure consisting of access tracks , substation and array cables

Active • 2026-27 (T-4)
4.65 MW
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0EL (3 components)

New build onshore wind farm. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.83 MW
Cumberhead Wind Farm, Douglas, Lanark, ML11 0SY (4 components)
• Existing generation windfarm. (2)
• New build windfarm.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.23 MW
Craigdarroch Farm, DG4 6LE, Sanquhar, Dumfries and Galloway, Scotland (6 components)

9-turbine wind farm located in Scotland with the installed capacity of 37.800MW (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.63 MW
C35, DG7 3UF, Castle Douglas , Scotland (5 components)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.40 MW
Brownhill Farm, West Benhar Road, Eastfield, Harthill, Shotts, North Lanarkshire, ML7 5TG (2 components)
• 1 Wind Turbine Generator
• 1 x Wind Turbine Generator
Active • 2026-27 (T-4)
0.57 MW
Loading map...
Showing 13 locations