Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

wind

11 unique locations (53 components)

West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (3 components)
• The CMU is an onshore windfarm connected to the distribution system at the Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.16 MW
Tealing Substation, Myreton Farm Cottages, Strathmartine, Dundee DD3 0PY. (14 components)
• Offshore Wind Farm with 30 Wind Turbines (2)
• Offshore wind farm with 38 wind turbines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
110.23 MW
Siemens Energy Construction Site Moray West 400kv Substation, Whitehillock Farm, Aberdeenshire, AB55 5PH The CMU Component is an offshore wind farm. An Ordnance Survey Grid reference of the CMU Component is provided below. (3 components)

The CMU component is an offshore wind farm which consists of: ? 40 X SGRE DD 222 X 14.7 MW Wind Turbine Generators (WTG). ? 40 X monopile foundations (MP). … (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
102.40 MW
Harting Rig Wind Farm, Lambhill Road, Nr Strathaven, South Lanarkshire, ML106XF (3 components)

Wind Turbine Generators x 15 (3)

Active • 2026-27 (T-4), 2024-25 (T-1) ...
4.13 MW
Greengairs Wind Farm, Greengairs, ML6 7TY (3 components)

Onshore Wind Farm at Greengairs (3)

Active • 2027-28 (T-4), 2024-25 (T-1) ...
2.53 MW
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0NN (3 components)
• 10 turbine onshore wind farm with a gross installed capacity of 42 MW in Lanarkshire, Scotland (2)
• New build onshore wind farm.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
3.24 MW
Cumberhead Wind Farm, Douglas, Lanark, ML11 0SY (4 components)
• Existing generation windfarm. (2)
• New build windfarm.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.23 MW
Craigdarroch Farm, DG4 6LE, Sanquhar, Dumfries and Galloway, Scotland (6 components)

9-turbine wind farm located in Scotland with the installed capacity of 37.800MW (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.63 MW
C35, DG7 3UF, Castle Douglas , Scotland (5 components)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.40 MW
Alva, Clackmannanshire, Scotland, FK14 7JZ (4 components)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system (2)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.31 MW
Aikengall IIa Wind Farm Innerwick EH42 1SG (5 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.47 MW
Loading map...
Showing 11 locations