Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

wind

14 unique locations (30 components)

3km south of Tweedsmuir, Scottish Borders, ML12 6QR (nearest) (2 components)

New build onshore wind farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Beinn An Tuirc 3 Wind Farm, Kintyre Peninsula, Campbeltown, Argyll, PA28 6QY (3 components)

An onshore windfarm consisting of 11 x 3.6MW and 3 x 3.45MW Wind Turbine Generators (WTGs) on the Kintyre Peninsula. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Chirmorie Wind Farm C72 FROM Gowland Terrace Barrhill, South of Chirmorie from Barrhill South Ayrshire Scotland (2 components)

This CMU will be formed of multiple wind turbine generator units controlled centrally & exporting to the Transmission system. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Farr and Glenkyllachy Estate, Inverness-shire. IV13 7YA (2 components)

20 turbine Onshore wind farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Greengairs Wind Farm, Greengairs, ML6 7TY (3 components)

Onshore Wind Farm at Greengairs (3)

Active • 2027-28 (T-4), 2024-25 (T-1) ...
2.53 MW
Halsary Windfarm, Off A9, Halkirk, Caithness, Scotland KW12 6UW (3 components)

An onshore windfarm consisting of 15 x 2MW Wind Turbine Generators (WTGs) in northern Scotland, Caithness (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Kirk Hill Wind Farm Kirk Hill nr Kirkoswald South Ayrshire Scotland KA26 9SP (2 components)

This CMU (KHWF01) will be formed of multiple wind turbine generator units controlled centrally & exporting to the Distribution system. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land north west of Gilston Farm, Heriot, Scottish Borders, EH37 5TF (2 components)

New build onshore wind farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land to the south of Elvanfoot, South Lanarkshire, ML12 6RL (nearest) (3 components)

New Build Onshore Wind Farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land west of the B788, Auchenfoil Road, Inverclyde, PA13 4TL (nearest) (2 components)

New build onshore wind farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Nr Elvanfoot, South Lanarkshire (1 component)

Onshore wind farm

Inactive • 2023-24 (T-4)
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (2 components)

New build wind farm at Aberarder consisting of 12 wind turbines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
*Please see cover letter regarding postcode Blary Hill wind farm, Off C20 road (Barr Glen Road), Glenbarr, Tarbert, Scotland, UK (2 components)

New build wind farm at Blary Hill consisting of 14 wind turbines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 14 locations