solar
74 unique locations (163 components) - Page 2 of 3
Manor Farm, Church Road, Maiden Newton, Dorchester, DT2 0AA (1 component)
Solar Voltaic generation scheme connected to the distribution network
Manor Farm, Burnett, Keynsham, Bristol, Somerset, BS31 2ED (2 components)
New Build CMU comprising of Solar PV and associated plant (2)
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (2 components)
40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021. (2)
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (2 components)
75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021. (2)
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (2 components)
The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.. (2)
Little Staughton Airfield Solar Park, Top Farm, Staploe, Saint Neots, PE19 5JB (2 components)
A 50 MWp solar asset with a 40 MW grid connection. Commissioned on 26/02/2021. (2)
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (7 components)
SolarPV generating station (3)
Leylodge, Aberdeenshire, AB51 0XY (2 components)
Land to the West of Home Farm, Tingrith, Milton Keynes, Bedfordshire, MK17 9EW (1 component)
Solar photovoltaic generation scheme connected to the distribution network
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)
CMU is a photovoltaic system (3)
Land To The East and West Of Lanhams, Lanham Farm Road, Cressing, Essex CM77 8DX (1 component)
CMU is a photovoltaic system
Land off torkington road, Hazel Grove, Greater Manchester, SK7 6NW (2 components)
New Build CMU comprising of Solar PV and associated plant (2)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire (1 component)
Solar PV Park with maximum export capacity of 49.9MW
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU (2 components)
Land lying between the villages of Mulbarton and Swainsthorpe, south of Norwich, NR14 8AJ (1 component)
CMU is a photovoltaic system
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
LAND AT NEW FARM ESTATE, OUSE MOOR ROAD, YORK, YO26 6HU (1 component)
Solar photovoltaic generation scheme connected to the distribution network
land at Keelings Road, Southminster, CM0 7JF (4 components)
Land At Glassthorpe Hill & Land Off Brington Road Flore Northamptonshire, NN7 3NF (2 components)
CMU is a photovoltaic system (2)
Land at Fiddlers Green, Carland Cross Windfarm, St. Newlands East. Windfarm Postcode: TR8 5AY (2 components)
A Solar PV site consisting of 21,987 panels of 455W Solar PV Panels (2)
Land At, Elms Farm, Newbold Road, Newbold Pacey, Warwickshire, CV35 9DP (1 component)
A Solar site that will be situated on 5 fields and comprise of mounted Silicon PV panels, String Inverters and Transformers. The PV panels will produce DC electricity, which will …
Land at Coal Clough Windfarm Burnley Windfarm Postcode: OL14 8NU (1 component)
A Solar PV site with a capacity of 8MW.
Land at Chapel Street, Stapleton, LE9 8FT (1 component)
A 21 MW solar PV asset with a 15 MVA export connection currently under construction.