solar

25 unique locations (75 components)

Bindwell Lane PV, Bindwell Lane, Queen Camal, Yeovil, BA22 7NF (2 components)

A 13 MWp solar PV site with a 9 MVA connection, currently under construction. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.05 MW
Blandford Hill, Dorset, DT11 9AW (2 components)

New build Solar PV array of 12MW capacity (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.41 MW
Boscar Grange Farm York Yo61 3NQ (5 components)

Solar Farm consisting of solar PV modules and inverters (3)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
1.48 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (5 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.89 MW
Bosworth Solar Farm, Hall Farm, Newbold Verdon, Leicestershire LE9 9NL (2 components)

The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims … (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.58 MW
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (2 components)

50 MW solar photovoltaic plant commissioned on 18/01/21. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
4.62 MW
High Garrett, Sisted, Braintree, Essex, CM77 8BX (2 components)

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 … (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Lakeshill Road, Worcestershire, WR11 8TS (2 components)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid …
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid …
Active • 2028-29 (T-4), 2025-26 (T-1)
2.58 MW
Land at Chapel Street, Stapleton, LE9 8FT (1 component)

A 21 MW solar PV asset with a 15 MVA export connection currently under construction.

Active • 2025-26 (T-1)
0.82 MW
land at Keelings Road, Southminster, CM0 7JF (4 components)
• New build generating CMU component known as Dengie BESS (2)
• New build generating CMU component known as Dengie Solar Park
Active • 2027-28 (T-4), 2025-26 (T-1)
3.33 MW
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)

CMU is a photovoltaic system (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.92 MW
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system (2)
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (7 components)

SolarPV generating station (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.37 MW
Little Staughton Airfield Solar Park, Top Farm, Staploe, Saint Neots, PE19 5JB (2 components)

A 50 MWp solar asset with a 40 MW grid connection. Commissioned on 26/02/2021. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
4.67 MW
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (2 components)

75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
5.85 MW
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (2 components)

40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
2.92 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Solar PV (2)
• Existing Solar PV
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.31 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (4 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.00 MW
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system (2)
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.17 MW
Rolleston Park Farm, Lodge Hill, Tutbury, Staffordshire, DE13 9HQ (2 components)

12 MW Solar PV Array (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.41 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• CMU is a photovoltaic system (2)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
South Lowfield Farm, Lowfield Lane, Kirkby Fleetham, Northallerton, North Yorkshire DL7 0SY (2 components)

Solar PV generating asset with a TIC of 50 MWp and a connection capacity of 40 MVA. It was commissioned on 14/07/2021. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
4.64 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared …
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (7 components)
• Solar PV generation site (2)
• SolarPV generating station
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.42 MW
Loading map...
Showing 25 locations