Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

solar

10 unique locations (42 components)

Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (6 components)
• Solar PV generation site (2)
• SolarPV generating station
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.42 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• CMU is a photovoltaic system (2)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system (2)
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.17 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (4 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.00 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Solar PV (2)
• Existing Solar PV
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.31 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (7 components)

SolarPV generating station (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.37 MW
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system (2)
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (5 components)

New Build CMU comprising of Solar PV and associated plant (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.22 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (4 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.89 MW
Loading map...
Showing 10 locations