Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

gas

147 unique locations (2816 components) - Page 1 of 6

Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.44 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (31 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (34 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
18.70 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (3 components)

A series of gas generators on an existing site. (3)

Active • 2026-27 (T-4), 2024-25 (T-1) ...
19.04 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (25 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (18 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.35 MW
153.14 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant (2)
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (21 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (12 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2191.04 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (17 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (20 components)
• Existing CCGT (2)
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (20 components)
• Existing CCGT (2)
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (49 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
398.36 MW
Loading map...
Showing 25 locations