Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

gas

328 unique locations (854 components) - Page 1 of 14

1020 CENTRE PARK, WARRINGTON WA1 1QY (2 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
112 Beddington Lane, Beddington CR0 4TB (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2236 London Road, Glasgow, G32 8YF (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2 Parsonage Lane, Rochester, Kent, ME2 4UR (1 component)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4)
33 Oxford Road Yeovil BA21 5HR (6 components)
• New build battery (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-4), 2020-21 (T-4)
501 Merlin Park, Burscough Industrial Estate, Ormskirk, L40 8JY (4 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
525 Brenda Rd, Hartlepool TS25 1HT (4 components)

Gas fired reciprocating engines. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
58 Appley Lane N, Appley Bridge, Wigan WN6 9AQ. (1 component)

A new build 5MW gas fuelled generating station.

Inactive • 2021-22 (T-4)
88 Coventry Road Broughton Astley Leicester LE9 6QA (6 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
975 Mollison Avenue EN3 7NN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
A1085, Middlesbrough TS6 7HJ (3 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
A1(M), Letchworth Garden City, SG6 2ER (2 components)

New 20MW gas-fired facility, metered on the distrbution network boundary using a COP2 meter with no auxilliary load on site (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Alders Way, Paignton, TQ4 7QL (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Alkane Haydock Energy Park Unit 2 Old Boston Trading Estate Wilcock Road Haydock WA11 9SJ (3 components)
• 4x 2MW Containerised Generating Sets
• Gas fired generating engines
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Allington Lane West End Southampton SO30 3HQ (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2018-19 (T-1), 2017-18 (T-1)
AMG Super Alloys, Fullerton Road, Rotherham, South Yorkshire, S60 1DL (4 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Anchor Lane Abbess Roding Ongar CM5 0JR (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ashland Farm Beck Lane Skegby Sutton in Ashfield NG19 6PG (2 components)

New Build gas fuelled generation station. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (4 components)
• Battery storage (2)
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations