Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

gas

144 unique locations (2671 components) - Page 2 of 6

South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (17 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.92 MW
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)

Active • 2024-25 (T-4), 2023-24 (T-4)
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)

Gas fuelled CHP generation plant (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
13.75 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit (2)
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit (4)
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Severn Power Station West Nash Road Nash Newport Gwent NP18 2BZ (2 components)
• Existing CCGT that is to be refurbished
• Refurbishment of existing plant
Active • 2027-28 (T-4), 2025-26 (T-4)
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (11 components)

Single Shaft CCGT (Module 2) (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1141.17 MW
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (12 components)

Multi Shaft CCGT (Module 1) (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2260.43 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components)

A Prospective New Build Gas reciprocating energy reserve facility (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs …
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (5 components)

Gas turbine generator (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
901.69 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (3)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
901.69 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (20 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.43 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components)
• Reciprocating gas engines running on natural gas (2)
• Additional reciprocating gas engines running on natural gas returned to service
Active • 2027-28 (T-4), 2026-27 (T-4) ...
10.24 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Power Station Road Isle of Grain Rochester ME3 0AR (60 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (12 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (19 components)

Peterhead CCGT (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3242.27 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (4 components)

Existing OCGT plant. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
690.18 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6183.38 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (61 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6183.38 MW
Loading map...
Showing 25 locations