Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

gas

102 unique locations (2257 components) - Page 1 of 5

111 Brancroft Way Enfield Middlesex EN3 7PL (13 components)

Enfield CCGT Power Station - (one unit station) (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1217.86 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (5 components)
• Combined Cycle Gas Turbine (2)
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2618.57 MW
4 Finway Road Hemel Hempstead HP2 7PT (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.74 MW
Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
284.59 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (13 components)

Small gas fired OCGT. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
149.89 MW
Basin Road South, Portslade, East Sussex, BN41 1WF (7 components)

Combined Cycle Gas Turbine plant (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1157.52 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (18 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.88 MW
Brentfield Road Willesden London NW10 8JP (24 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Brentfield Road Willesden London NW10 8JP (22 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (15 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.87 MW
Cavendish Rd Stevenage SG1 2ET UK (17 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Cavendish Rd Stevenage SG1 2ET UK (15 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (33 components)
• Killingholme Module 1 converted to open cycle operation (2)
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1775.69 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (26 components)
• Killingholme Module 1 converted to open cycle operation (2)
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1775.69 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Loading map...
Showing 25 locations