94 unique locations (1992 components) - Page 1 of 4

Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local …
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas …
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.44 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (34 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (25 components)
• West Burton B Power Station CMU 1 WB1-22= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 3 WB3-17= 100% T_WBURB-3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (18 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• CMU consisting of multiple reciprocating engines and alternators
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.35 MW
Victory Road, Derby, Derbyshire, DE24 9HX (8 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2028-29 (T-4), 2027-28 (T-4) ...
153.14 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (12 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2191.04 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (17 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (20 components)
• Existing CCGT (2)
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (49 components)
• Staythorpe 3 - CCGT
• Staythorpe 3 - CCGT MSID: 7210
• Staythorpe 4 - CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (17 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.92 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (11 components)

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
11.89 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (14 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.36 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (16 components)
• 4x Jenbacher JGS 616 GS
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.75 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Severn Power Station West Nash Road Nash Newport Gwent NP18 2BZ (2 components)
• Existing CCGT that is to be refurbished
• Refurbishment of existing plant
Active • 2027-28 (T-4), 2025-26 (T-4)
1141.17 MW
2260.43 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (2 components)
• New build open cycle gas turbine
• New build open cycle gas turbine generating plant
Active • 2025-26 (T-4), 2024-25 (T-4)
Loading map...
Showing 25 locations