Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

gas

16 unique locations (418 components)

Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
18.70 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (20 components)
• Existing CCGT (2)
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (20 components)
• Existing CCGT (3)
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit (2)
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit (4)
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
901.69 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (3)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
901.69 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (33 components)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2314.80 MW
Medway Power Station, Rochester, Medway, ME3 0AG (18 components)

Medway CCGT (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3352.85 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (12 components)
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF. (2)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
Active • 2028-29 (T-4), 2027-28 (T-4) ...
167.00 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (58 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
268.28 MW
Drax Power Station, Drax, Selby, YO8 8PH (22 components)

This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (11 components)

One (1) Open Cycle Gas Turbine MSID: 7382 (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
123.42 MW
Loading map...
Showing 16 locations