gas

93 unique locations (1475 components) - Page 1 of 4

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (34 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam … (2)
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (12 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution … (2)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (15 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (14 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.35 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant (2)
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (7 components)
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and … (2)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (20 components)
• Existing CCGT (3)
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (49 components)
• Staythorpe 1 - CCGT MSID: 7210 (2)
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)

Active • 2024-25 (T-4), 2023-24 (T-4)
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)

Gas fuelled CHP generation plant (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit (4)
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (6 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (2)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components)

A Prospective New Build Gas reciprocating energy reserve facility (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (3)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
901.69 MW
Loading map...
Showing 25 locations