1020 CENTRE PARK, WARRINGTON WA1 1QY (2 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
112 Beddington Lane, Beddington CR0 4TB (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2236 London Road, Glasgow, G32 8YF (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2 Parsonage Lane, Rochester, Kent, ME2 4UR (1 component)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4)
33 Oxford Road Yeovil BA21 5HR (6 components)
• New build battery (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-4), 2020-21 (T-4)
501 Merlin Park, Burscough Industrial Estate, Ormskirk, L40 8JY (4 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
525 Brenda Rd, Hartlepool TS25 1HT (4 components)

Gas fired reciprocating engines. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
58 Appley Lane N, Appley Bridge, Wigan WN6 9AQ. (1 component)

A new build 5MW gas fuelled generating station.

Inactive • 2021-22 (T-4)
88 Coventry Road Broughton Astley Leicester LE9 6QA (6 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
A1(M), Letchworth Garden City, SG6 2ER (2 components)

New 20MW gas-fired facility, metered on the distrbution network boundary using a COP2 meter with no auxilliary load on site (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (59 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
AMG Super Alloys, Fullerton Road, Rotherham, South Yorkshire, S60 1DL (4 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Anchor Lane Abbess Roding Ongar CM5 0JR (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (4 components)
• Battery storage (2)
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (6 components)
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to … (2)
• Gas fired generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (22 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements (2)
• Existing CCGT Baglan Unit 1 (2)
• Existing OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (20 components)
• Existing CCGT Baglan Unit 1 (2)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (17 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility. (2)
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Basin Road South. Portslade. East Sussex. BN41 1WF (4 components)

Combined Cycle Gas Turbine plant (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Beach Lane Bitton Bristol BS30 6NP (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4)