Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

dsr

1886 unique locations (4547 components) - Page 5 of 76

WENTWORTH CRESCENT HAYES MIDDLESEX UB3 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WELL FARM MISSON SPRINGS DONCASTER SOUTH YORKSHIRE DN10 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Welburn Grove Middlesbrough North Yorkshire TS7 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Weighbridge Road, Shotton, Deeside, CH5 2LL (10 components)

Paper mill industrial site (3)

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
WEDDINGTON ROAD NUNEATON WARWICKSHIRE CV10 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WEBTON COURT ALLERTON PARK, LEEDS, LS7 (2 components)

EV charging on residential premises (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
Waverley Mills Innerleithen Scottish Borders EH44 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (12 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR (3)

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Water Mill Clough Oldham Lancashire OL2 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
WATERMEAD SALE CHESHIRE M33 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Waterloo Way Wellingborough Northamptonshire NN9 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
4.00 MW
Water Lane Chelveston WELLINGBOROUGH NORTHAMPTONSHIRE NN9 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Waterfield Tunbridge Wells Kent TN2 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
WARWICK PARK TUNBRIDGE WELLS TN2 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
WARK HEXHAM NE48 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Wansford Intake, WANSFORD INTAKE,  Track Off A47,  Sutton,  STAMFORD Lincolnshire,  PE8 6PN, (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WANSFORD INTAKE, WANDSFORD, PE8 6PN (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
WANSFORD INTAKE, WANDSFORD, PE8 6LG (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
WALLACETOWN COURT DUNDEE DD4 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WALDLEY GROVE PYPE HAYES BIRMINGHAM WEST MIDLANDS B24 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Walderton, Walderton Pumping Station, Walderton, PO18 9EE (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Loading map...
Showing 25 locations