Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

dsr

235 unique locations (993 components) - Page 1 of 10

Yeomans Way, Bournemouth, BH8 0BQ (4 components)

Import/Export metering with diesel generation at a retail store (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (6 components)

8MW Energy Storage facility located in Harrogate. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Worlds End, Forest Road, Hambledon, PO7 4QU (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (7 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (5 components)
• Import/Export metering with diesel generation at a retail store (2)
• DSR Component providing load turn down at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR E.ON UK Plc Not Prequalified MK17
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Windsor Road, Redditch, Worcestershire, B97 6EF (5 components)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wherstead WR, WHERSTEAD-WB, Track off 137 (op The Street), Wherstead, IPSWICH, IP9 2AP, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
West Street, Soberton, Southampton, SO32 3PH (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (12 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR (3)

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wansford Intake, WANSFORD INTAKE,  Track Off A47,  Sutton,  STAMFORD Lincolnshire,  PE8 6PN, (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Walderton, Walderton Pumping Station, Walderton, PO18 9EE (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (7 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Uttons Drove STW, Uttons Drove STW, Off Andersons Road, Swavesey Road, CAMBRIDGE, CB24 4UQ, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Uppingham STW, Sewage Treatment Works, Seaton Road, Uppingham, OAKHAM Leicestershire, LE15 9TX (4 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 25 locations