Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

dsr

325 unique locations (999 components) - Page 1 of 13

Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (6 components)

8MW Energy Storage facility located in Harrogate. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR E.ON UK Plc Not Prequalified MK17
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Windsor Road, Redditch, Worcestershire, B97 6EF (5 components)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wimbourne Bournemouth BH21 5EP (4 components)

Water treatment centre (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (3 components)
• 1MW of demand reduction (2)
• 1 MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wherstead WR, WHERSTEAD-WB, Track off 137 (op The Street), Wherstead, IPSWICH, IP9 2AP, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wansford Intake, WANSFORD INTAKE,  Track Off A47,  Sutton,  STAMFORD Lincolnshire,  PE8 6PN, (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Uttons Drove STW, Uttons Drove STW, Off Andersons Road, Swavesey Road, CAMBRIDGE, CB24 4UQ, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Uppingham STW, Sewage Treatment Works, Seaton Road, Uppingham, OAKHAM Leicestershire, LE15 9TX (4 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (4 components)

19 MW of demand reduction (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Upminster STW, UPMINSTER STW, St Marys Lane, North Ockendon, UPMINSTER Essex, RM14 3PA (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (4 components)
• 5 MW of demand reduction (2)
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (2 components)

5 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional DE6
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Toll Bridge Rd, Eyemouth TD14 5GN, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
To be determined (77 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components. (3)

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Tinwell Intake, TINWELL INTAKE, Private road off Tinwell Road, (goes to business park) Tinwell, STAMFORD Lincolnshire, PE9 3UD, (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 25 locations