Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

dsr

109 unique locations (597 components) - Page 1 of 5

Yeomans Way, Bournemouth, BH8 0BQ (4 components)

Import/Export metering with diesel generation at a retail store (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (5 components)
• Import/Export metering with diesel generation at a retail store (2)
• DSR Component providing load turn down at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (5 components)

3 x 1.6MW POSGU (standby generation) (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (3 components)
• 1000kW/1200kWh Lithium Ion Battery (2)
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Unproven DSR yet to be procured (36 components)

Unproven DSR yet to be procured (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
The Owlcotes Centre, Varley Street, Pudsey, LS28 6AR (5 components)
• Import/Export metering with diesel generation at a retail store (2)
• DSR Component providing load turn down at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components)
• 800kW/1100kWh Lithium Ion Battery (2)
• 0.8 MW of demand reduction
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
TA9 3QG (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP5 3EU (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (5 components)

2 POSGU (1.0MW and 0.6MW) (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SN15 3QZ (4 components)

Water treatment centre (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Portbury, Bristol, BS20 7XS (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
Loading map...
Showing 25 locations