Wind

65 unique locations (171 components) - Page 3 of 3

Priestgill Wind Farm, Little Gill Farm, Abington ML12 6RW (1 component)

Wind farm consisting of 7 of 6.6MW wind turbines

Active • 2027-28 (T-4)
3.06 MW
Pwlldraenllwyn, Llangwyryfon, Wales, SY23 4SR (2 components)

Llangwyryfon MPAN ID: 1300050649070 The CMU is an onshore windfarm connected to the distribution system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
1.28 MW
Scroby Sands Wind Farm, Admiralty Road, Great Yarmouth, NR30 3NS (3 components)

Offshore wind farm

Active • 2028-29 (T-4)
17.37 MW
Siemens Energy Construction Site Moray West 400kv Substation, Whitehillock Farm, Aberdeenshire, AB55 5PH The CMU Component is an offshore wind farm. An Ordnance Survey Grid reference of the CMU Component is provided below. (3 components)

The CMU component is an offshore wind farm which consists of: ? 40 X SGRE DD 222 X 14.7 MW Wind Turbine Generators (WTG). ? 40 X monopile foundations (MP). … (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
102.40 MW
South Kyle Wind Farm, New Cumnock (off B741), Dalmellington, Ayr, KA6 7FP (2 components)

50 Turbine onshore wind farm with a gross installed capacity of 240 MW in East Ayrshire, Scotland (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
33.72 MW
Stokeford Farm, East Stoke, Wareham, Dorset, BH20 7NU, England (1 component)

4 x 2MW wind turbine generators to be installed on the lands of Stokeford Farm, East Stoke, Dorset, England.

Active • 2025-26 (T-4)
Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN (2 components)

4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.15 MW
Tealing Substation, Myreton Farm Cottages, Strathmartine, Dundee DD3 0PY. (17 components)
• Offshore Wind Farm with 30 Wind Turbines (2)
• Offshore wind farm with 38 wind turbines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
150.83 MW
The site is located next to A836, Crask, Highland, Scotland (2 components)
• 22 wind turbines new built with expected capacity installed of 79.2 MW
• 22 wind turbines new built with expected capacity installed of 92.4 MW
Active • 2024-25 (T-4), 2022-23 (T-3)
Todholes Farm, Denny Road, Fintry, Glasgow, G63 0XH (1 component)

Earlsburn Wind Farm

Active • 2028-29 (T-4)
2.44 MW
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (6 components)
• 1 x 4.2MW Onshore Wind Turbine Generator (2)
• 1 x Wind Turbine Generating Unit
Active • 2026-27 (T-4), 2023-24 (T-1)
1.25 MW
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (3 components)
• The CMU is an onshore windfarm connected to the distribution system at the Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.16 MW
Whitelee Windfarm, Eaglesham Moor, to the south of Glasgow. G76 0QQ (1 component)

An onshore windfarm of 140x2.3 MW Wind turbine Generators with an export capacity of 305 MW. It is shared with a 50MW BESS project (CMU - WLBAT1)

Active • 2028-29 (T-4)
16.93 MW