Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

189 unique locations (1035 components) - Page 1 of 8

24A Flightway Dunkeswell Honiton EX14 4LG (4 components)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (9 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
33 Oxford Road Yeovil BA21 5HR (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-4)
350 Petre Street Sheffield S4 8LU (16 components)
• New build battery
• New build battery.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Albion Road, Dartford DA1 5PS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Albion Road, Dartford, Kent, DA1 5PZ (17 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Amersham Road Denham Buckinghamshire SL9 7AW (10 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (10 components)
• Battery storage
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Aylesford BES Site Old Church Road Burham Kent ME20 7PA (4 components)

29MW Battery Storage located at Aylesford.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (6 components)

Battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Birch Holt Farm Burton By Lincoln LN1 2RG (4 components)

The CMU component at Leverton Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 5MW.

Inactive • 2018-19 (T-1)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (9 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (5 components)
• 11MW of 60 minute frequency response, battery storage
• two 1.4MW caterpillar generators
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Boots, DD8 3BS (9 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Borland Ave, Carlisle CA1 2TL (5 components)

2MW BESS

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Boundary Street, Wigan WN1 3AP (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Breck Road, Wallasey, Liverpool (5 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation.

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Bristol Road Gloucester GL2 5YA (8 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Carnegie Road, Liverpool, L13 7HY. (6 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Church Farm Solar Farm Slapton Leighton Buzzard Bedfordshire LU7 9BX (4 components)

The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Commercial Road, Wolverhampton, WV1 3RD (4 components)

battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Cowm Top Lane, Rochdale, OL11 2PU (1 component)

Battery Storage Facilty

Inactive • 2021-22 (T-4)
Denmead Farm Edneys Lane Denmead Waterlooville PO8 0SJ (1 component)

24.95 MW of Battery Storage located at Waterlooville.

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations